Use "variable cost" in a sentence

1. That's the variable cost.

2. The proposed transmission pricing method divides transmission cost into fixed cost, variable cost and additional cost.

3. Complete cost method and variable cost method are two different cost calculation methods with distinct characteristics.

4. According to the correlation with output, the cost is classified as fix cost and variable cost.

5. There is a fixed activation cost and a variable cost based on calls made.

6. In addition, the author discusses the control method for constant cost and variable cost.

7. Therefore, total variable cost for each coach was $300.

8. Its fixed cost is $ The variable cost unit is $ 30 and price is $ 5 unit.

9. There fore, total variable cost for each coach was $300.

10. You'll see something like cost of goods or variable costs.

11. The cost accountant then looks at each cost account balance and estimates either the variable cost per unit of cost driver activity or the periodic fixed cost .

12. Breakeven units = fixed costs/(price – variable cost per unit) This makes sense

13. What Is Absorbed Cost? Absorbed cost, also known as absorption cost, is a managerial accounting method that accounts for the variable and fixed …

14. Confirm and monitor variable cost in co - packers and branch to meet the budget.

15. Confirm and monitor variable cost in co - packers and branch to meet the annual budget.

16. The actual variable cost would depend upon the actual number of families returning to India.

17. B. Fixed and Variable Costs The Agency's operating budget is comprised of fixed and variable cost elements, both of which experienced abnormal activity in 1999-2000.

18. There are many components that make up a mortgage package, each with its own variable cost.

19. 90 absorption costing method while for financial statement purposes the person may use the variable cost method.

20. Variable overhead spending variance is the difference between actual variable overhead cost, which is based on the costs of indirect materials involved in manufacturing, and the Budgeted costs

21. Shutdown point: is the output and price at which the firm just covers its total variable cost .

22. Adding this to the variable costs of $300 per coach produced a full cost of $325 per coach.

23. The less variable cost there is, the more the additional revenue earned will contribute to the overall profit.

24. The decision variable of the seller is the replenishment cycle time to minimize the total relevant cost. Sentencedict.com

25. The objective function on line 20 minimizes the total food cost as the total of each decision variable (amount of food) multiplied by that food's cost per unit.

26. Cotres's Will Sell The Pads For $150 A Pair And They Will Cost $100 In Variable Costs To Produce

27. 5 Rainfall in the tropics is notoriously variable; variable winds; variable expenses.

28. Atraumatic and conventional needles remain variable in cost, with prices differing on the basis of the specific needle subtype and manufacturer

29. The Agency's operating budget is comprised of fixed and variable cost elements, both of which experienced abnormal activity in 1999-2000.

30. Measuring a variable is synonymous with defining that variable.

31. Variable valve actuation system and method using variable oscillating cam

32. The default variable label is the variable label (if any) or variable name of the source variable with (Binned) appended to the end of the label

33. Target variable

34. 18 Measuring a variable is synonymous with defining that variable.

35. For each custom variable, select a variable that contains the value you want to pass to the variable.

36. Variable reactance circuit

37. Variable storage warehouse

38. Type of variable

39. Variable Proxy Configuration

40. (variable speed engines)

41. Variable abort timer

42. If one variable is influencing another variable, then you will have Bivariate …

43. RLR || variable || Variable speed engine for propulsion of railcars || RLR-v-1 || C1

44. Bunds having variable grades throughout their length, are called variable graded Bunds

45. An Avoidable cost is an expense that will not be incurred if a particular activity is not performed. Avoidable costs refer primarily to variable costs that …

46. Allocation of variable consideration

47. Budget: Variable, yearly allocation

48. Voltage-controlled variable capacitor

49. Variable reluctance torque coupler

50. The actuator converts continuously variable voltage and current into continuously variable force and displacement.

51. His master explanatory variable is market capitalism and his dependent variable is peasant rebellion.

52. "Social cost − private cost = External cost".

53. Modify the selected variable

54. Her mood is variable.

55. Voltage variable capacitor array

56. Cost synonyms, Cost pronunciation, Cost translation, English dictionary definition of Cost

57. Anniversariness Variable playback speed

58. Variable Speed: New variable speed pumps offer a noticeable improvement over accumulator tank systems.

59. To this thin layer of variable density is analogous a sheet illuminated of variable intensity.

60. Analogously, we have a variable

61. Electrical capacitors, fixed or variable

62. Variable-pitch propeller or repeller

63. Hence, variable 3.2.1 should be consistent with overtime earnings in the reference month (variable 4.2.1).

64. Billiardly The variable or property

65. Variable nozzle device of turbocharger

66. These dips have variable shapes.

67. Variable capacitors (including pre-sets)

68. Variable, I am not receiving.

69. Engine with variable compression ratio

70. Continuously variable transmission regulation process

71. This implies that ecodesign requirements for electric motors should be adjusted and ecodesign requirements set for variable speed drives, to realise their full potential for cost-effective energy efficiency.

72. 15.5 Variable message signs (additional).

73. I'm genX, the unknown variable.

74. Variable magnification afocal optical system

75. (3) Fixed or variable gauge.

76. Switches with variable control voltages

77. His mood/temper is variable.

78. These systems are infinitely variable.

79. The variable Pension contributions receivable from members (# # #) is used in the calculation of the variable Turnover

80. The point Biserial correlation is a measure of association between a continuous variable and a binary variable