Use "sludge thermal dewatering" in a sentence
1. Absorptive sludge dewatering process for papermaking waste
2. Key words: chemical preconditioning, gravity thickening, dewatering, sludge, facultative aerated lagoons.
3. Key words: conditioning, dewatering, sludge, facultative aerated lagoons, natural freeze–thaw, trials.
4. The project consisted of an oxidation ditch, raw sewage screw pumps, a Circumfuse for sludge dewatering, glass lined sludge storage tanks, final clarification, and UV disinfections
5. Dewatering and desalting in electric dewatering plant in oil refinery.
6. In Italy the most common treatments are aerobic digestion (including composting), anaerobic digestion, mechanical dewatering, thermal drying, chemical treatment with alkali.
7. In France sludge is subject to prolonged aeration, aerobic or anaerobic stabilisation, lime conditioning, composting, or thermal drying.
8. Soil sludge, compost sludge, bio-sludge and clarified sludge mixers (machines)
9. Screw conveyors, in particular for sludge, including digested sludge, industrial sludge or sewage sludge
10. Sludge collector having sludge collecting block
11. Sludge heating unit, sludge heating method, and sludge hydrolysis apparatus using same
12. Key words: electroosmosis, polymeric additive, electroosmotic dewatering, clay physical properties.
13. Four different kinds of sludge were used: alum sludge (water treatment), waste-activated sludge, simultaneous precipitation, and anaerobically digested mixed sludge.
14. - Activated sludge : sludge sampling sites and concentration,
15. On this basis, it presents the improved deign formula of dewatering. Applying this formula, it can make the well point dewatering design more rational, convenient and speedy.
16. The sludge is pumped into a sludge digester, and from there it goes into the sludge chamber.
17. SLUDGE ACID
18. Activated sludge
19. The digested sludge is dewatered and the liquid sludge fraction and the liquid component of the dewatered digested sludge is passed to an activated sludge tank (6).
20. - re-circulation of activated sludge and pumping off of excess sludge,
21. - sludge storage basin,
22. Sludge supply device
23. Sludge-processing device
24. mean sludge age and mean hydraulic retention time; method of sludge wastage; methods of overcoming bulking, loss of sludge, etc. ;
25. mean sludge age and mean hydraulic retention time; method of sludge wastage; methods of overcoming bulking, loss of sludge, etc.
26. Sludge will be treated using an activated sludge process, entailing prolonged aeration.
27. Guarantee proper operation of secondary clarifier sludge collection and return sludge pumping
28. Activated sludge process
29. Activated sludge chambers
30. Sludge-drying apparatus
31. Digested sludge inoculum (Vl )
32. Thermal Grizzly Aeronaut Thermal Grease Paste - 3.9 Grams Visit the Thermal Grizzly Store
33. Activated sludge plant: overviews
34. Activated sludge treatment systems
35. Digestion of organic sludge
36. Inoculation with activated sludge
37. Cesspits Equal footing, as it would seem In pursuant to containing The human sludge Rank sludge, foul sludge The sludge Standing of the near-immaculate Must still be shielded from The unfortunate
38. Activated sludge plant: detail
39. Device for removing bottom sludge and/or floating sludge from circular settling basins
40. From Sludge to Soil
41. Processing entails degreasing, pickling, Blacking and lastly an immersion in a dewatering oil, all with
42. (32) Conventional treated sewage sludge includes lagoon stored, thickened and mesophilic anaerobic digested sludge.
43. - Recirculation of activated sludge
44. You drank that sludge?
45. The present invention provides a new method for dewatering difficult sludges, such as autothermal thermophilic aerobic digestion sludges.
46. Activated sludge respiration inhibition testing
47. - buffer tank for digested sludge
48. Treatment of sludge, in particular fatty sludge, by means of hydrolysis and aerobic digestion of fats
49. - Settling properties of activated sludge : the activated sludge in large flocs, must have good settling properties.
50. Typically mining Backfill is a final treatment stage and takes place immediately after dewatering
51. Process for aerobic sludge treatment
52. Then there is treated sludge.
53. Centrifugal separator for food sludge
54. Sludge can be removed from the bottom and also withdrawn from the sludge-blanket zone.
55. - removal of excess activated sludge,
56. Treatment plant with activated sludge
57. Activated Sludge Simulation Biodegradability Tests
58. See that green bubbling sludge?
59. 9.2 | Of which: Sewage Sludge Gas | A biogas produced from the anaerobic fermentation of sewage sludge |
60. Conversion of Sludge into Useful Products : The sludge obtained on treatment of effluents is also a problem .
61. Sludge treatment device having dehydrator
62. Thermal anemometer
63. Thermal water
64. Raw sludge used in these studies was obtained from a municipal high-rate activated sludge plant.
65. Activated sludge degassing process and device
66. Sludge discharging device for settlement basin
67. Apparatus for pre-treating waste activated sludge and method for pre-treating waste activated sludge using same
68. A pressure lock (46) transfers tunneled material to dewatering (50) and reservoir/accumulator means (74).
69. Primary sludge is found to be antithixotropic at low shear stress. Digested sludge does not exhibit time dependency.
70. Thermal spraying?
71. Upflow anaerobic sludge blanket (UASB) process
72. Figure 1 Activated sludge plant: overviews
73. Process for processing acid resins sludge
74. Prevents buildup of tank bottom sludge.
75. The pilot-plant treating 70 population equivalents of domestic wastewater is operated with a 12 day sludge age. Nanosilver was applied to the activated sludge tank within two sludge ages.
76. Activated sludge process for sewage purification
77. The Aqua-Barrier Cofferdam is an inflated, water-filled barrier that is essential for dewatering construction sites
78. For instance, he interfered with the hauling of sludge, causing sludge to back up at the plant, they said.
79. Create a temporary Cofferdam for dewatering and aquatic construction work such as excavation, culvert installation, or maintenance work
80. Sludge hydrolysis device, a sludge hydrolysis method using the same, and a contact type of heat exchange unit and steam type of heat exchange unit provided in the sludge hydrolysis device