Use "spillways" in a sentence

1. * The NE after a detailed analysis of a data base of about 13000 dams from the International Commission on Large Dams (ICOLD)'s World Register of Dams to analyse the type of spillway, gated or ungated, and a historical review of construction of large orifice outlets as well as a consideration of ICOLD guidelines, held that the site conditions at Baglihar require a gated spillway, and also held that in view of the high flood discharges and heavy silt loads, India's design of gated spillways – both chute (surface) spillway and sluice spillways, as well as the number, size and location of their gates for the Baglihar dam complies with the design criteria set out in Annexure D of the Indus Waters Treaty.

* तटस्थ विशेषज्ञ ने स्लिपवे के स्वरुप, गेटयुक्त हो अथवा गेट रहित इसके विश्लेषण के लिए अंतर्राष्ट्रीय बृहद बाँध आयोग (आईसीओएलडी) के बांधों के विश्व रजिस्टर से लगभग 13000 बांधों के डाटाबेस के गहन विश्लेषण, विशाल छिद्र निकासी के निर्माण की ऐतिहासिक समीक्षा तथा आईसीओएलडी के दिशानिर्देशों पर विचार-विमर्श के बाद यह माना कि बगलिहार में कार्यस्थल की परिस्थितियों में गेटयुक्त स्पिलवे आवश्यक है और यह भी माना कि अधिक पानी छोड़ने और भारी सिल्ट भार को देखते हुए गेटयुक्त स्पिलवे – दोनों शूट (सतह) स्पिलवे और स्लूस स्पिलवे दोनों की भारतीय डिजाइन, बगलिहार बाँध के लिए गेटों की संख्या, आकार और स्थान, सिंधु जल संधि के अनुबंध-घ में निर्धारित डिजाइन मापदंड को पूरा करते हैं ।

2. The determination upheld India's design flood value of 16,500 cumec against Pakistan's calculations of 14,900 cumec; upheld India's design of gated spillways; provided for freeboard of 3 metres as against 4.5 metres designed by India and 0.84 m calculated by Pakistan; provided for a maximum pondage of 32.56 million cubic metres (MCM) as against 37.5 MCM calculated by India and 6.22 MCM calculated by Pakistan; fixed the intake level 3 metres higher than as designed by India; and provided for India to resort to drawing down of reservoir for its maintenance and sustainability during monsoon season each year.

इसमें पाकिस्तान के 14,900 क्यूमेक के परिकलन की तुलना में 16,500 क्यूमेक के भारत के डिजाइन बाढ. मूल्य का समर्थन, भारत के " गेटेड स्पिलवेज" के डिजाइन का समर्थन भारत द्वारा डिजाइन की गई 4.5 मीटर और पाकिस्तान द्वारा परिकलित 0.84 मी0 की तुलना में 3.00 मीटर का प्रावधान,भारत द्वारा परिकलित 37.5 एम0सी0एम0 और पाकिस्तान द्वारा परिकलित 6.22 एम0 सी0 एम0 की तुलना में 32.56 मिलियन क्यूबिक मीटर के अधिकतम सरोवर का प्रावधान,