rolling stock test plant in Vietnamese
@Chuyên ngành kỹ thuật
@Lĩnh vực: giao thông & vận tải
-thiết bị thử nghiệm toa xe
Sentence patterns related to "rolling stock test plant"
1. Subsystem: Conventional rolling stock
2. b) railway rolling stock
3. Investment in Rolling Stock
4. * adequate and clean rolling stock as well as timely provision of rolling stock (optional)
5. CROSS ACCEPTANCE OF ROLLING STOCK
6. The railroads needed them to keep their rolling stock rolling.
7. — rolling stock, infrastructure and the environment.
8. Cross-community acceptance of rolling stock
9. Characteristics to be activated by rolling stock
10. Track-side train detection systems shall have the characteristics necessary to be activated by rolling stock which conforms to the rolling stock TSI.
11. Bygone Wagons 3d Printed representations of UK rolling stock
12. Justification Constructive approval for rolling stock cannot be accepted.
13. Exterior doors: access to and egress from Rolling stock
14. The cross acceptance of rolling stock in the EU
15. Rolling stock with Class A and Class B equipment
16. b) To contribute to the modernization of rolling stock
17. Subject: Communication on noise abatement measures for existing rolling stock
18. Double sets of wheels pull together like centipede rolling stock.
19. Exhibits include a widely representative collection of railway rolling stock.
20. TSI Rolling Stock HS: Actual no requirement specified in section
21. - the legislative proposal relating to cross-acceptance of rolling stock;
22. Common bugle plant - Bugleweed stock illustrations.
23. (b) rolling stock as defined in point 2.1.2 of the Annex.
24. 8. Conditions for continuing running after an accident involving rolling stock
25. All Keihin-Tohoku Line rolling stock is based at Urawa Depot.
Toàn bộ các tàu tuyến Keihin-Tohoku được bảo dưỡng tại trạm Urawa Depot.