eut (equipment under test) in Vietnamese

@Chuyên ngành kỹ thuật
@Lĩnh vực: toán & tin
-thiết bị đang kiểm tra
@Chuyên ngành kỹ thuật
@Lĩnh vực: toán & tin
-thiết bị đang kiểm tra

Sentence patterns related to "eut equipment under test"

Below are sample sentences containing the word "eut equipment under test" from the English - Vietnamese Dictionary. We can refer to these sentence patterns for sentences in case of finding sample sentences with the word "eut equipment under test", or refer to the context using the word "eut equipment under test" in the English - Vietnamese Dictionary.

1. During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure

2. During this test, the equipment under test (EUT) will be connected to a source of aerostatic pressure.

3. During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure.

4. During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure (of #,# times the maximum pressure and in the case of a Class # component, #,# times the maximum classification pressure

5. During this test the equipment under test (EUT) will be connected to a source of aerostatic pressure (of 1,5 times the maximum pressure and in the case of a Class 3 component, 2,25 times the maximum classification pressure).

6. Besully Automatic test equipment

7. Dynamometer and test cell equipment

8. Measuring and Test Equipment 5.

Công nghệ kỹ thuât địa chất 5.

9. Test, Inspection and Production Equipment

10. This ac-powered source's energy consumption shall be measured and reported for the imaging equipment product under test.

11. Portable test equipment for air filters

12. Brise Motorsport & Automotive Test Equipment

13. Test, calibration or alignment equipment, specially designed for equipment specified in 7A.

14. Test, calibration, and alignment equipment specially designed for equipment specified in 10.

15. Test, calibration or alignment equipment specially designed for equipment specified in 7A.

16. Note: requirements for engine-driven equipment differ between emissions test and power test.

17. Note: Requirements for engine-driven equipment differ between emissions test and power test

18. Test under free acceleration

19. Test, calibration or alignment equipment specially designed for equipment specified in #A# above

20. Test, calibration or alignment equipment specially designed for equipment specified in 7A117 above .

21. Test, calibration or alignment equipment specially designed for equipment specified in 7A117 above.

22. Montaineering equipment — Pulleys — Safety requirements and test methods

23. Cameramen also clean, test and maintain camera equipment

24. Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 11: Metering equipment

25. Electricity metering equipment (AC) - General requirements, tests and test conditions -- Part 11: Metering equipment