critical path in English

noun
1
the sequence of stages determining the minimum time needed for an operation, especially when analyzed on a computer for a large organization.
The deterministic critical path is the critical path that is determined without the consideration of risk; it is the collection of tasks that determine the total completion time of the project.

Use "critical path" in a sentence

Below are sample sentences containing the word "critical path" from the English Dictionary. We can refer to these sentence patterns for sentences in case of finding sample sentences with the word "critical path", or refer to the context using the word "critical path" in the English Dictionary.

1. Critical Path, another movielike game, is Considerably more focused

2. The "critical path method" (CPM) was developed as a joint venture between DuPont Corporation and Remington Rand Corporation for managing plant maintenance projects.

3. The Critical path is a series of tasks (or sometimes only a single task) that controls the calculated start or finish date of the project

4. 14 This paper discusses the application of adjacency matrix at the algorithm's analysis for traversing Graph, Minimum cost Spanning Tree, Topological sort and Critical Path.

5. During the time this committee was active, the Bioastronautics Critical Path Roadmap of April 2004 (NASA, 2004) evolved into the Bioastronautics Roadmap of February 9, 2005 (NASA, 2005)

6. Introduction: Occurrence of serious cardiac dysrhythmias and diminished cardiac and vascular function are the primary cardiovascular risks of spaceflight identified in the 2005 NASA Bioastronautics Critical Path Roadmap

7. What Is The Third Component Used In Making A Calendarized Budget? Project Charter Project Plan Critical Path Network Diagram NEXT > BOOKMARK CLEAR 51 The Project Team Is Determining The Duration For Upgrading The Software On The App Used On Its Mobile Devices.

8. A windows schedule analysis, also referred to as a “Contemporaneous period schedule analysis,” is a retrospective schedule impact analysis technique that generally utilizes Contemporaneous schedule updates, in conjunction with as-built facts related to a delay or change, to quantify schedule impacts to the as-built critical path associated with the change or delay.

9. It is sometimes a difficult task to identify which part of the system represents this critical path, and some test tools include (or can have add-ons that provide) instrumentation that runs on the server (agents) and reports transaction times, database access times, network overhead, and other server monitors, which can be analyzed together with the raw performance statistics.

10. 11: Adders CMOS VLSI Design Slide 13 Carry-Ripple Adder qSimplest design: cascade full Adders – Critical path goes from Cin to Cout – Design full adder to have fast carry delay C in C out B 1 A 1 B 2 A 2 B 3 A 3 B 4 A 4 S 4 S 3 S 2 S 1 C 3 C 2 C 1