Use "shift ones ground" in a sentence
1. He refused to shift his ground .
2. To shift our borders, governing models, and ways of living from non-Bioregional ones - to Bioregional ones
3. So the sunny ones swirl around, the cloudy ones float along, the rainy ones fall down, and the snowy ones flutter to the ground.
4. Thus did ecological explanations regain ground earlier lost to generational ones.
5. Seek common ground on major issues while reserving differences on minor ones.
6. You put enough soldiers in the ground, you get tired of writing new ones.
7. Bimas masters the ability to shift from the most aggressive sounds to deep or melodic ones with elegance and style
8. Bimas masters the ability to shift from the most aggressive sounds to deep or melodic ones with elegance and style
9. In particular, national desires to shift from import-replacing investments to export-creating ones may be confounded by administrative impossibility.
10. Shift work.
11. 16 Disable a previous shift up or shift down.
12. The way that biculturals shift in response to cultural primes: integrated biculturals shift Assimilatively, whereas conflicted biculturals shift contrastively
13. Left bit shift
14. Shift capstan bars.
15. To become foot-sure and fearless in such tightrope bridge crossings, he practiced on easier ones a few inches above the ground.
16. Third Shift (after midnight
17. Adjusted gear-shift lever
18. It will never shift.
19. Not on my shift.
20. Don't try to shift!
21. Which ones moo, and which ones bark?
22. And this shift in mindset also requires a shift in the assumptions that we carry.
23. Capturing The Renewable Energy Shift
24. Using phase shift key modulation.
25. 15.01 Adjusted gear-shift lever
26. To change the alignment, press Ctrl + Shift + L (Windows or Chrome OS) or ⌘ + Shift + L (Mac).
27. Use the blue ones, not the pink ones.
28. The night shift are arriving.
29. The night shift starts at
30. .the backward shift (“Backshift”) operator
31. 10.04 Adjusted gear-shift lever
32. I got the night shift.
33. That car can really shift!
34. To wit, a paradigm shift.
35. Early shift at the Stowaway?
36. Ben works the day shift.
37. Shall I shift the chairs?
38. So take my shift, alright?
39. Arrowing a shift changes the …
40. Custodian -3rd Shift Harper College Harper College is seeking applicants for the Custodian -3rd Shift position
41. To KZ - 28 vibrator, shift gears realized by the shift gears valve on the operator's panel.
42. Past research on attribution biases finds that BII influences the way that biculturals shift in response to cultural primes: integrated biculturals shift Assimilatively, whereas conflicted biculturals shift …
43. Chambray Shift Shirt Dress for Women
44. Occasionally he will get in early to see the morning shift or stay late for the night shift.
45. White ones and grey ones, With long beaks, they fly.
46. White surfaces have long edges, black ones have short ones.
47. Position: Craftsperson – Mold maker 2nd shift
48. b. using phase shift key modulation.
49. Modern detergents will shift most stains.
50. I'm on the early shift tomorrow.
51. yeah, i work the night shift.
52. 3rd Shift Custodians ← Back to Jobs
53. The supply curve would shift out.
54. b. Using phase shift key modulation.
55. I'm, uh, starting a new shift.
56. The Boehmist Shift to Universalism 5.5
57. Shift change at 1 Police Plaza.
58. The night shift was just arriving.
59. (b) Using phase shift key modulation.
60. Can you shift the levitation beam?
61. Select Help > Shortcuts in the application menu or press Ctrl + Shift + / (Windows) or Alt + Cmd + Shift + / (Mac).
62. Firefox 2.0 users need to press the key combination Shift + Alt (for example: Shift + Alt + 0 for Home).
63. In general, because repeated iteration corresponds to a shift, the transfer operator, and its adjoint, the Koopman operator can both be interpreted as shift operators action on a shift space.
64. This twin shift will force wrenching adjustments.
65. Ground Beef All lean trim can be ground as ground beef.
66. Jehovah describes such selfish ones as ‘despoilers of the afflicted ones.’
67. Read the concierge shift Log-Book, check if some things which last shift left need to be follow up.
68. The Cacophonous ones sound bad, and the euphonious ones sound good
69. 19 Blind ones!
70. The ancient ones.
71. Keeping abreast of the renewable energy shift
72. It will create a huge macroeconomic shift.
73. It's almost time for the next shift.
74. TINA DIDN'T SHOW UP FOR HER SHIFT.
75. Do cemetery workers prefer the graveyard shift?
76. Bedside SHIFT REPORT (BSR) can save lives
77. Allosteric activator would shift enzyme towards the
78. The wind is expected to shift tomorrow.
79. Could you help me shift some furniture?
80. Crewing Coordinator 1st Shift ← Back to Jobs