power plant at the toe of dam in Vietnamese

@Chuyên ngành kỹ thuật
@Lĩnh vực: điện
-nhà máy thủy điện (kiểu) chân đập

Sentence patterns related to "power plant at the toe of dam"

Below are sample sentences containing the word "power plant at the toe of dam" from the English - Vietnamese Dictionary. We can refer to these sentence patterns for sentences in case of finding sample sentences with the word "power plant at the toe of dam", or refer to the context using the word "power plant at the toe of dam" in the English - Vietnamese Dictionary.

1. It is the location of the Roseires Dam and power generation plant.

Đây là nơi có đập Roseires và nhà máy thủy điện.

2. I'm at the power plant.

Tôi ở nhà máy phát điện.

3. Seepage is found at downstream dam surface and inside corridor after RCC dam impoundment at a power station.

4. However, even before the dam for the power plant was built, Lüner Lake was the largest mountain lake in the Alps.

5. A hydroelectric plant by the huge dam is idle.

6. 27 He works at a power plant.

7. There we learned of the explosion at the nuclear power plant.

Ở đó, chúng tôi nghe về vụ nổ tại nhà máy điện hạt nhân.

8. Also, it damaged the nuclear power plant of Fukushima, the nuclear power plant just by the water.

Và nó cũng hủy hoại nhà máy năng lượng hạt nhân ở Fukushima chỉ với nước.

9. * Express happiness at the successful running of the Grodno Power Plant inaugurated in 2015.

10. On Monday, there was a breach in the reservoir dam of a Hungarian alumina plant.

11. The state of Blue Nile is home to the Roseires Dam, the main source of hydroelectric power in Sudan until the completion of the Merowe Dam in 2010.

Bang Nin Xanh sở hữu đập Roseires, vốn là nguồn thủy điện chính của Sudan cho đến khi hoàn thành đập Merowe năm 2010.

12. A pfbc-power plant

13. The number 2 reactor at Tōkai Nuclear Power Plant was shut down automatically.

Lò phản ứng số 2 tại nhà máy điện hạt nhân Tōkai đã tự ngưng hoạt động.

14. Bataan Nuclear Power Plant is a nuclear power plant, completed but never fueled, on Bataan Peninsula, 100 kilometres (62 mi) west of Manila in the Philippines.It is located on a 3.57 square kilometre government reservation at Napot Point in Morong, Bataan.It was the Philippines' only attempt at building a nuclear power plant.

15. A bunion is a painful lump at the base of the big toe , which may cause the toe to bend unnaturally .

Viêm bao hoạt dịch ngón cái là bướu lồi gây đau nhức ở đáy ngón chân cái , có thể làm cho ngón chân gập xuống một cách bất thường .

16. She landed her first triple-triple combination jump, a triple toe-triple toe combination, at age of 14 at the 2005 World Junior Championships.

Năm 14 tuổi, cô lần đầu tiên thực hiện cú nhảy kết hợp triple-triple tại Giải vô địch trẻ thế giới năm 2005.

17. They've infiltrated our power plant.

18. The TOE shall preserve a secure state during power supply cut-off or variations.

19. The total emitted power of the DAM component is about 100 GW, while the power of all other HOM/KOM components is about 10 GW.

Tổng công suất phát xạ trong dải DAM là khoảng 100 GW, còn tổng công suất phát xạ của hai dải HOM và KOM là khoảng 10 GW.

20. Layout structure of floating storage gas power plant

21. Opposed to the building or use of nuclear power plants: Antinuclear demonstrators picketed the power plant.

22. 9 Public utility electricity power plant.

23. A bunion is a bump at the base of the big toe.

24. 8 Decommissioning of a public utility electricity power plant.

25. Why are we going to the power plant?

Sao chúng tôi phải đến nhà máy phát điện?