class cost system in Vietnamese

@Chuyên ngành kinh tế
-chế độ phí tổn phân loại

Sentence patterns related to "class cost system"

Below are sample sentences containing the word "class cost system" from the English - Vietnamese Dictionary. We can refer to these sentence patterns for sentences in case of finding sample sentences with the word "class cost system", or refer to the context using the word "class cost system" in the English - Vietnamese Dictionary.

1. Accelerated Cost Recovery System - Acrs: The accelerated cost recovery system was a U.S

2. • A more sustainable cost recovery system.

3. Portal site cost distribution/recovery system

4. FC Full cost system / Full cost with actual indirect costs reporting model

5. a description of the cost recovery system;

6. * A globally cost competitive manufacturing eco-system;

7. The old class system is slowly disappearing.

8. How much less would it cost to send it second class?

9. System, method and program for agency cost estimation

10. StoneGlo Backlighting System Class 2 Magnetic Dimmable Driver

11. The cost information provided by traditional cost management system is torturous in modern manufacturing industry.

12. Class 1 also includes the cost of certain additions or alterations you made after 1987 to a Class 3 building.

13. She believed in the fixity of the class system.

14. Computerised Accounting System Class 11 MCQs Questions with Answers

15. Hire the Elite Class Chauffeur Service Company in London from the best Chauffeur Company in London at an cost effective cost

16. Class II agents are anti-sympathetic nervous system agents.

Class II các chất là chất chống hệ thần kinh giao cảm.

17. It also looks at the current and future cost drivers and cost accelerators in the health system.

18. She Capably argues the injustices of the medieval class system

19. This class system has long been regarded as functionally otiose.

20. Casteism in Nepal is a centuries-old social class system

21. Pipe system API 5L class B with a threaded connection.

22. Attendances class 87, born in Ancona, a small town in the east cost of Italy

23. By means of a computer control system that cost $5 million.

24. Commander is a cost-effective and complete powersports dealer management system

25. The major capital cost expenditures were system development and PC acquisition.